← Research Harness

Nancy · TV2V Dataset Reports

Task status, exact sample counts, dataset reports, and human-review evidence. Official fast-check comments take priority when deciding the next workflow stage.

Status refreshed 2026-08-11 · 8 Ready + Merged · Tasks 240, 241, and 242 active · 17,034 verified Final samples
11
owned tasks
8
ready + merged
17,034
ready Final samples
3
active lifecycle tasks

Current Tasks 10 total

Current production state and active Gate reviews in one place. Abandoned stride-one expansions are separated below.

Task 119
Rolling Shutter Correction
Carla / BS-RSC rolling-shutter video → aligned global-shutter video
2026-07-28 · Replacement Gate C + Promotion was independently approved at exact head 0b7a622c and merged into dev as be018181. The append-only BS-RSC population adds IDs 251–331 while preserving Carla IDs 1–250.
READY · MERGEDBS-RSC INTERNAL ONLY331 Final
Task 120
Dense Optical Flow Visualization
RGB video → deterministic pure forward-optical-flow color video
2026-08-05 · The MPI Sintel-only v1.8 clarity repair produced and independently audited 46 Final samples / 184 objects. Gate C passed both human checkpoints at exact head b90a497c and merged into dev as 7c8f1284.
READY · MERGEDMPI SINTEL ONLY46 Final · 184 objects
Task 144
Video Instance Identity Tracking
Complete VIPSeg RGB video → mask-only video with one stable color per object identity
2026-07-31 · Canonical Full produced and audited 3,149 samples. Gate C passed both human checkpoints at exact head b83aa4ea and merged into dev as 941e35a1.
READY · MERGEDVIPSEG3,149 Final
Task 145
Indoor 3D Object Box Visualization
Complete ARKitScenes RGB video → depth-aware projected oriented 3D boxes with stable identity colors
2026-08-01 · Canonical Full produced and audited 9,988 samples / 39,952 objects from 996 admitted captures. Gate C passed both human checkpoints at exact head ab0dfa15 and merged into dev as 2a3364db.
READY · MERGEDARKITSCENES9,988 Final · 39,952 objects
Task 146
Video Action Boundary Visualization
Complete Perception Test RGB video + Prompt action/RGB mapping → frame-aligned text-free color timeline
2026-08-05 · The repaired 1,000-video Full produced and independently audited 1,000 Final samples / 4,000 objects. Gate C passed both human checkpoints at exact head fa593c8c and merged into dev as f05b8c4d.
READY · MERGEDPERCEPTION TEST1,000 Final · 4,000 objects
Task 238
Doodle Stroke Order Reconstruction
Start-point cue + fine six-frame Quick, Draw! steps → continuous timestamp-faithful drawing animation
2026-08-11 · Live recheck confirms PR #516 remains MERGED and APPROVED at exact head d50f41f3, with final control-plane SUCCESS and merge a590a309. The corrected Full contains 1,200 exact Final samples (12 categories × 100), complete VersionId-pinned readback, and independent byte-identical reproduction.
READY · MERGEDQUICK, DRAW!1,200 Final · 12 Gate C review
Task 239
Document Layout Role Visualization
Static DocLayNet page → cumulative semantic bounding-box and role-label visualization
2026-08-11 · Live recheck confirms PR #525 remains MERGED and APPROVED with control-plane SUCCESS at exact head fa3d49c7 and merge 1623213e. The audited Full contains 1,200 canonical Final samples / 4,800 objects with exact VersionID readback.
READY · MERGEDDOCLAYNET1,200 Final · 12 Gate C review
Task 240
Scientific Plot Reasoning Visualization
PlotQA chart + quantitative question → staged official-operand highlights and compact answer expression
2026-08-11 · Live recheck confirms remediation PR #530 is OPEN, APPROVED, CLEAN, and control-plane SUCCESS at exact head 1da41748. Its eight-sample Validation passed Owner and MJXWANG; trusted Workflow state remains READY_TO_MERGE. It has not merged and Full has not started.
GATE B · DUAL PASS · READY TO MERGEPLOTQA V28 Validation · 224,377 census universe
Task 241
Classical Algorithm Execution Trace Visualization
Official CLRS initial state → chronological sorting, search, graph, shortest-path, and string-algorithm trace
2026-08-09 · Binary-search videos state the lower-bound goal and label the official result explicitly. Owner PASS is recorded at exact head c747f703; PR #507 is Ready and MJXWANG is requested for independent Evaluator review.
GATE B · READY · OWNER PASSCLRS-30 V1.0.08 Validation · ~30,000 train planned
Task 242
Radar Precipitation Nowcasting
Thirteen past SEVIR VIL radar frames → twelve subsequently observed frames for the same event and region
2026-08-10 · The complete fourteen-file VIL source scan finished and froze a 55,882-window clean manifest from 18,746 represented events. Resume was byte-identical, all 14 shards validated-skip, and an independent streaming audit passed. This is source-cleaning evidence only: no commit, S3 publication, PR, Gate B human decision, or Final generation exists yet.
SOURCE CLEANING · PASSSEVIR VIL55,882 clean windows · pre-Final

Production Capacity 8 complete · 3 active

All eight ready tasks have completed Full generation, independent Gate C review, and promotion. Tasks 240, 241, and 242 remain active and pre-Final; none contributes to the ready totals below. Task 242 has completed its source-frame census, but not Gate B or Final generation. Historical stride-one and multi-dataset expansion investigations remain abandoned and do not replace the accepted Final populations.